Search plants, projects, owners, and states
19.6 MW Onshore Wind Turbine (6 MW) + Petroleum Liquids (14 MW) operating in Nobles, MN
19.6 MW
Nameplate Capacity
13
Generators
units
Hybrid (2)
Technology
Onshore Wind Turbine + Petroleum Liquids
2002
Operating Since
Coordinates
43.6335, -95.6092
County
Nobles, MN
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Worthington - (MN) | WPPI Energy | — |
| Owner(s) | City of Worthington - (MN), WPPI Energy | WPPI Energy | — |
| Status | Operating | — | — |
The Worthington plant, located in Nobles County, Minnesota, is a hybrid power plant with a total capacity of 19.6 MW. It is owned and operated by the City of Worthington - (MN). The plant began operating in 2002 and utilizes both petroleum liquids (DFO) and onshore wind turbine technologies. It consists of 13 generators. The Worthington plant operates within the Midcontinent Independent Transmission System Operator, Inc. balancing authority and the MRO NERC region.
The plant's wind component features NEG Micon NM52 wind turbines, with a rotor diameter of 52 meters and a hub height of 70 meters. In the latest year of reported generation data, the plant produced 8,961 MWh, resulting in a capacity factor of 5.2%. The Worthington plant is ranked 10th out of 59 plants in Minnesota and 200th out of 886 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
12.47 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
557 MWh
Latest Month
9.0K MWh
Annual Generation
5.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
8 lb/MWh
NOx
0.148 lb/MWh
SO₂
0.014 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
5.7%
Annual Net Gen
10 GWh
CO₂eq
8 lb/MWh
Subregion
MRO West
2013
$765/kW
Est. Construction Cost
Total estimated cost: $15.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
West Substation · 69 kV
Substation Distance
3.039 km
Operator
Worthington Public Utilities
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
ALTW.WRTHNGT
Pricing Hub
MINN.HUB
Location Type
Load Zone
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-04-09
View all articlesNo Ask reports yet for this entity.
Ask about WorthingtonForward forecasts, scenario decomposition, and risk-decision tooling for this asset.