Search plants, projects, owners, and states
75 MW Hydro operating in Garland, AR
75 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
1955
Operating Since
Coordinates
34.5710, -93.1944
County
Garland, AR
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | USCE -Vickburg District | US Army Corps of Engineers - Vicksburg District | — |
| Owner(s) | USCE -Vickburg District | US Army Corps of Engineers - Vicksburg District | — |
| Status | Operating | operating | — |
GEM identifies the owner as US Army Corps of Engineers - Vicksburg District
This entity is not yet in the GEM ownership database — chain unavailable.
Blakely Mountain Hydroelectric Plant, located in Garland County, Arkansas, is a 75 MW conventional hydroelectric facility that began operating in 1955. The plant is owned and operated by USCE -Vickburg District and utilizes water as its primary fuel source. It consists of two generators.
The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the SERC NERC region. In the most recent year of data, Blakely Mountain generated 158,101 MWh of electricity, achieving a capacity factor of 24.2%. Blakely Mountain is the 8th largest power plant in Arkansas out of 19, and ranks 236th nationally out of 1464 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
115.0 kV
Regulatory Status
RE — Regulated
Entity Type
Federal
Sector
Electric Utility
4.1K MWh
Latest Month
158.1K MWh
Annual Generation
24.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $172.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
EAI.CC.BLAKLY
Pricing Hub
ARKANSAS.HUB
Location Type
Generation Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Blakely MountainForward forecasts, scenario decomposition, and risk-decision tooling for this asset.