23 MW Muni. Waste operating in Goodhue, MN
23 MW
Nameplate Capacity
2
Generators
units
Municipal Solid Waste
Technology
1949
Operating Since
Coordinates
44.5690, -92.5164
County
Goodhue, MN
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Northern States Power Co - Minnesota | Northern States Power Co | — |
| Owner(s) | Northern States Power Co - Minnesota | Xcel Energy | — |
| Status | Operating | operating | — |
The Red Wing plant, located in Goodhue County, Minnesota, is a 23 MW waste-to-energy facility that began operating in 1949. It is owned and operated by Northern States Power Co - Minnesota, a subsidiary of Xcel Energy. The plant utilizes municipal solid waste (MSW) as its primary fuel source and consists of two generators. Red Wing operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the MRO NERC region. It is ranked as the third largest of four MSW plants in Minnesota, and 37th out of 56 nationally.
In its most recent year of operation, the Red Wing plant generated 125,601 MWh of electricity, achieving a capacity factor of 62.2%. Financial data indicates an installed cost of $2755.97 per kW, as reported to FERC.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
13.8 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
11.3K MWh
Latest Month
125.6K MWh
Annual Generation
62.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
2152 lb/MWh
NOx
9 lb/MWh
SO₂
3 lb/MWh
CH₄
1 lb/MWh
N₂O
0.181 lb/MWh
Capacity Factor
66.8%
Annual Net Gen
135 GWh
CO₂eq
2239 lb/MWh
Subregion
MRO West
Steam turbine · Northern States Power Company (Minnesota) · Data from 2015–2024
$3,787/kW
Installed Cost
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Red Wing · 69 kV
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
NSP REDWING REDWIN_1_UNIT
Pricing Hub
MINN.HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-14