Search plants, projects, owners, and states
21.3 MW Distillate Oil operating in Cheboygan, MI
21.3 MW
Nameplate Capacity
1
Generators
unit
Petroleum Liquids
Technology
1971
Operating Since
Coordinates
45.3627, -84.2946
County
Cheboygan, MI
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Wolverine Power Supply Coop | — | — |
| Owner(s) | Wolverine Power Supply Coop | — | — |
| Status | Operating | — | — |
The Tower power plant, located in Cheboygan County, Michigan, has a total capacity of 21.3 MW. The plant began operating in 1971 and is fueled by distillate fuel oil (DFO). It consists of a single generator utilizing petroleum liquid technology. Wolverine Power Supply Coop is the plant's operator. Tower is ranked 8th out of 26 similar plants in Michigan and 187th out of 886 nationally.
The plant operates within the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and the ReliabilityFirst Corporation (RFC) NERC region. Financial data indicates an installed cost of $168.79 per kW. The plant's latest annual generation was 62 MWh, resulting in a capacity factor of 0.0%.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
69.0 kV
Regulatory Status
RE — Regulated
Entity Type
Cooperative
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
4 MWh
Latest Month
62 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1268 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
7 lb/MWh
SO₂
4 lb/MWh
CH₄
0.051 lb/MWh
N₂O
0.010 lb/MWh
Capacity Factor
0.1%
Annual Net Gen
0 GWh
CO₂eq
1272 lb/MWh
Subregion
RFC Michigan
Gas turbine · Wolverine Power Supply Cooperative, Inc. · Data from 2015–2018
$112/kW
Installed Cost
$-6/kW
Annual CapEx
$2463.4/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Tower Substation · 69 kV
Substation Distance
< 10 km
Operator
Wolverine Power Supply Cooperative
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MICHIGAN.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about TowerForward forecasts, scenario decomposition, and risk-decision tooling for this asset.