Search plants, projects, owners, and states
13.5 MW Distillate Oil operating in Oakland, MI
13.5 MW
Nameplate Capacity
5
Generators
units
Petroleum Liquids
Technology
1970
Operating Since
Coordinates
42.7100, -83.4555
County
Oakland, MI
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | DTE Electric Company | DTE Electric | — |
| Owner(s) | DTE Electric Company | DTE Energy | — |
| Status | Operating | — | — |
Placid 12 is a 13.5 MW peaking power plant located in Oakland County, Michigan. The plant began operating in 1970 and is owned and operated by DTE Electric Company, a subsidiary of DTE Energy. The facility consists of 5 generators utilizing petroleum liquids, specifically distillate fuel oil (DFO), as its primary fuel source. Placid 12 operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the RFC NERC region.
The plant's installed cost was $145.15 per kilowatt, according to FERC data. Placid 12 is ranked as the 12th largest petroleum liquids plant in Michigan out of 26 such plants, and nationally it is ranked 269th out of 886 similar plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
40.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Internal combustion · DTE Electric Company · Data from 2015–2024
$137/kW
Installed Cost
$-37/kW
Annual CapEx
$-350.2/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Placid Substation · 345 kV
Substation Distance
0 km
Operator
ITC
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
DECO.PLACDP12
Pricing Hub
MICHIGAN.HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Placid 12Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.