Search plants, projects, owners, and states
64.9 MW Natural Gas operating in Essex, MA
64.9 MW
Nameplate Capacity
2
Generators
units
Natural Gas Fired Combustion Turbine
Technology
1971
Operating Since
Coordinates
42.5428, -70.9285
County
Essex, MA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Peabody - (MA) | — | — |
| Owner(s) | City of Peabody - (MA) | — | — |
| Status | Operating | — | — |
Waters River is a 64.9 MW natural gas-fired power plant located in Essex County, Massachusetts. The plant began operating in 1971 and consists of two natural gas-fired combustion turbine generators. It is owned and operated by the City of Peabody, Massachusetts. Waters River operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region.
In the most recent year of reported data, Waters River generated 4,584 MWh of electricity, resulting in a capacity factor of 0.8%. According to state rankings, the plant is the 18th largest out of 37 power plants in Massachusetts. Nationally, it ranks as the 1041st largest out of 1963 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
115.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
4.6K MWh
Annual Generation
0.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
892 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
5 lb/MWh
SO₂
0.000 lb/MWh
CH₄
0.041 lb/MWh
N₂O
0.006 lb/MWh
Capacity Factor
0.8%
Annual Net Gen
4 GWh
CO₂eq
895 lb/MWh
Subregion
NPCC New England
2013
$965/kW
Est. Construction Cost
Total estimated cost: $62.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Waters River Substation · 115 kV
Substation Distance
< 10 km
Operator
Peabody Municipal Light Plant
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
UN.WATER_RV115 W_J2
Pricing Hub
.H.INTERNAL_HUB
Location Type
NETWORK NODE
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.