15.1 MW Natural Gas Internal Combustion Engine (11 MW) + Petroleum Liquids (4 MW) operating in Osage, KS
15.1 MW
Nameplate Capacity
9
Generators
units
Hybrid (2)
Technology
Natural Gas Internal Combustion Engine + Petroleum Liquids
1955
Operating Since
Coordinates
38.6329, -95.8279
County
Osage, KS
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Osage City - (KS) | — | — |
| Owner(s) | City of Osage City - (KS) | — | — |
| Status | Operating | — | — |
The Séliš Ksanka Ql̓ispé Dam, also known as SKQ Dam, is a concrete gravity-arch dam located at river mile 72 of the Flathead River. Built in 1938, it raises the level and increases the size of Flathead Lake near Polson, Montana. The dam was designed to generate hydroelectricity but also serves recreational and irrigation uses.
Read more on WikipediaThe Osage City power plant is located in Osage County, Kansas. The plant has a total capacity of 11.1 MW derived from seven natural gas-fueled internal combustion engine generators. It began operating in 1955 and is owned and operated by the City of Osage City - (KS).
The plant operates within the Southwest Power Pool (SPP) balancing authority and the Midwest Reliability Organization (MRO) NERC region. According to rankings, the plant is the 42nd largest in Kansas out of 53 plants, and 1430th nationally out of 1963 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
115.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$965/kW
Est. Construction Cost
Total estimated cost: $14.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Osage City Junction · 115 kV
Substation Distance
< 10 km
Operator
Evergy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
SPP
LMP Node
WROSAGE-3LD2
Pricing Hub
SPPNORTH_HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Osage CityForward forecasts, scenario decomposition, and risk-decision tooling for this asset.