Search plants, projects, owners, and states
2451.5 MW Bit. Coal operating in Berkeley, SC
2,451.5 MW
Nameplate Capacity
4
Generators
units
Conventional Steam Coal
Technology
1984
Operating Since
Coordinates
33.3715, -80.1132
County
Berkeley, SC
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | South Carolina Public Service Authority | South Carolina Public Service Authority | — |
| Owner(s) | South Carolina Public Service Authority | South Carolina Public Service Authority | — |
| Status | Operating | — | — |
Cross Generating Station is a 2,390 MW, four unit coal-fired power station located in Pineville, South Carolina. It is owned by Santee Cooper, formally known as the South Carolina Public Service Authority. The nameplate capacity of each unit is 590.9 MW, 556.2 MW, 591 MW, and 652 MW respectively. In 2016, Cross switched from using higher quality bituminous coal, to refined coal, which is a lower quality coal that is refined to release less toxins and is backed by the US government. The future of the plant has become more uncertain due to downward trends in use, talks of shuttering the station, and converting it to natural gas. However, no official statements have been made on the future of the plant.
Read more on WikipediaThe Cross Generating Station is a 2,451.5 MW coal-fired power plant located in Berkeley County, South Carolina. It began operating in 1984 and is owned and operated by the South Carolina Public Service Authority. The plant utilizes conventional steam coal technology and consists of four generators. It is the largest power plant in South Carolina out of four total plants, and ranks seventh nationally out of 50 coal plants.
In the most recent year with available data, Cross generated 8,773,860 MWh of electricity, achieving a capacity factor of 40.8%. The plant operates within the South Carolina Public Service Authority balancing authority area and is part of the SERC NERC region.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
South Carolina Public Service Authority (SC)
Grid Voltage
230.0 kV
Regulatory Status
RE — Regulated
Entity Type
State
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
604.3K MWh
Latest Month
8.8M MWh
Annual Generation
40.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
2203 lb/MWh
NOx
0.773 lb/MWh
SO₂
1 lb/MWh
CH₄
0.248 lb/MWh
N₂O
0.036 lb/MWh
Capacity Factor
40.4%
Annual Net Gen
8449 GWh
CO₂eq
2220 lb/MWh
Subregion
SERC Virginia/Carolina
No financial data available for this plant.
This is the open data foundation underneath InfraSure's analytical layer — if you have sources or want more coverage here, drop a note.
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about CrossForward forecasts, scenario decomposition, and risk-decision tooling for this asset.