Search plants, projects, owners, and states
10 MW Natural Gas operating in Cass, IA
10 MW
Nameplate Capacity
1
Generators
unit
Natural Gas Fired Combustion Turbine
Technology
1999
Operating Since
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Atlantic Municipal Utilities (IA) | — | — |
| Owner(s) | Atlantic Municipal Utilities | — | — |
| Status | Operating | — | — |
The Atlantic power plant is a 10 MW natural gas-fired combustion turbine facility located in Cass County, Iowa. It began operating in 1999 and has one generator. The plant is owned and operated by Atlantic Municipal Utilities. It ranks 26th out of 37 power plants in Iowa by capacity, and 1447th nationally out of 1963 plants.
The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority. In the most recent year with available data, the Atlantic plant generated 110 MWh of electricity, resulting in a capacity factor of 0.1%.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
161.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
9 MWh
Latest Month
110 MWh
Annual Generation
0.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
1667 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
5 lb/MWh
SO₂
0.045 lb/MWh
CH₄
0.037 lb/MWh
N₂O
0.005 lb/MWh
Capacity Factor
0.1%
Annual Net Gen
0 GWh
CO₂eq
1669 lb/MWh
Subregion
MRO West
2013
$965/kW
Est. Construction Cost
Total estimated cost: $9.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
MISO
LMP Node
Behind the meter
Pricing Hub
MINN.HUB
Node Source
EIA-860 direct report
Last updated 2026-04-09
View all 10 articlesNo Ask reports yet for this entity.
Ask about AtlanticForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo