Search plants, projects, owners, and states
584.1 MW Sub. Coal operating in Woodbury, IA
584.1 MW
Nameplate Capacity
1
Generators
unit
Conventional Steam Coal
Technology
1975
Operating Since
Coordinates
42.3252, -96.3797
County
Woodbury, IA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | MidAmerican Energy Co | — | — |
| Owner(s) | IES Utilities, Inc, MidAmerican Energy Co | — | — |
| Status | Operating | — | — |
George Neal North is a coal-fired power plant in Iowa.
Read more on WikipediaGeorge Neal North is a 584.1 MW subbituminous coal-fired power plant located in Woodbury County, Iowa. The plant, which began operating in 1975, has one generator utilizing conventional steam coal technology. MidAmerican Energy Co. operates the facility, which is interconnected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority within the MRO NERC region. George Neal North ranks as the 5th largest of 9 coal plants in Iowa, and 52nd out of 75 nationally.
In the most recent year of reported data, George Neal North generated 1,807,945 MWh of electricity, achieving a capacity factor of 35.4%. Financial data indicates an installed cost of $915.64 per kW, based on FERC filings. The plant has been the subject of 6 news articles, with 5 focusing on industry-related topics and 1 on regulatory matters.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
345.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
135.8K MWh
Latest Month
1.8M MWh
Annual Generation
35.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
2306 lb/MWh
NOx
3 lb/MWh
SO₂
4 lb/MWh
CH₄
0.271 lb/MWh
N₂O
0.039 lb/MWh
Capacity Factor
24.5%
Annual Net Gen
1253 GWh
CO₂eq
2324 lb/MWh
Subregion
MRO West
Steam turbine · Interstate Power and Light Company · Data from 2015–2024
$1,107/kW
Installed Cost
$3/kW
Annual CapEx
$79.5/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
George Neal North Substation · 161 kV
Substation Distance
< 10 km
Operator
MidAmerican Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
MEC.NEALN3
Pricing Hub
MINN.HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about George Neal NorthForward forecasts, scenario decomposition, and risk-decision tooling for this asset.