7.9 MW Natural Gas operating in Lancaster, NE
7.9 MW
Nameplate Capacity
1
Generators
unit
Natural Gas Steam Turbine
Technology
1988
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
40.8665, -96.6145
Reference point reported to EIA.
County
Lancaster, NE
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
1 mapped line section connects the two facilities over 4.134 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Archer Daniels Midland Co | — | — |
| Owner(s) | Archer Daniels Midland Co | — | — |
| Status | Operating | — | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
The Archer Daniels Midland Lincoln plant is a natural gas-fired power plant located in Lancaster County, Nebraska. The plant has a total capacity of 7.9 MW and began operating in 1988. It consists of a single natural gas steam turbine generator. The plant is owned and operated by Archer Daniels Midland Co.
In the most recent year of reported data, the plant generated 10,956 MWh of electricity, resulting in a capacity factor of 15.7%. The Archer Daniels Midland Lincoln plant operates within the Southwest Power Pool (SPP) balancing authority and the Midwest Reliability Organization (MRO) NERC region. It is ranked as the 19th largest power plant in Nebraska out of 30, and 1484th nationally out of 1963 plants.
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
35.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
262 MWh
Latest Month
11.0K MWh
Annual Generation
15.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1240 lb/MWh
NOx
2 lb/MWh
SO₂
0.403 lb/MWh
CH₄
0.141 lb/MWh
N₂O
0.020 lb/MWh
Capacity Factor
13.0%
Annual Net Gen
9 GWh
CO₂eq
1250 lb/MWh
Subregion
MRO West
2013
$965/kW
Est. Construction Cost
Total estimated cost: $7.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
SPP
LMP Node
No sales
Pricing Hub
SPPNORTH_HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Archer Daniels Midland Clinton
Data-driven briefing on Archer Daniels Midland — fleet, generation, financial, and news signals.
NE Renewable Power Jonesboro
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Archer Daniels Midland Decatur
Data-driven briefing on Archer Daniels Midland — fleet, generation, financial, and news signals.
Archer Daniels Midland Peoria
Data-driven briefing on Archer Daniels Midland — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.