45.6 MW Geothermal operating in Imperial, CA
45.6 MW
Nameplate Capacity
3
Generators
units
Geothermal
Technology
1989
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
32.7761, -115.2630
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
This mapped site is shared by multiple plant records.
County
Imperial, CA
Nearby Plants
The line is mapped. The plant’s electrical connection and official point of interconnection still need confirmation.
1 mapped line section connects the two facilities over 0.159 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Ormat Nevada Inc | — | — |
| Owner(s) | Ormat Nevada Inc | — | — |
| Status | Operating | operating | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Ormesa III is a 45.6 MW geothermal power plant located in Imperial County, California. The plant began operating in 1989 and is owned and operated by Ormat Nevada Inc. It utilizes geothermal technology for electricity generation. The plant consists of 3 generators and is interconnected to the Imperial Irrigation District balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
In the most recent year with available data, Ormesa III generated 44,416 MWh of electricity, resulting in a capacity factor of 11.1%. Ormesa III is ranked as the 17th largest geothermal plant in California (out of 33) and the 26th largest in the United States (out of 70). Recent news coverage of Ormesa III includes 2 articles related to deals and 1 article related to industry news.
Grid Region
California (non-ISO)
Market
Bilateral Market
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Imperial Irrigation District (IID)
Grid Voltage
92.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
4.7K MWh
Latest Month
44.4K MWh
Annual Generation
11.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.000 lb/MWh
CH₄
—
N₂O
—
Capacity Factor
17.2%
Annual Net Gen
69 GWh
CO₂eq
0.000 lb/MWh
Subregion
WECC Southwest
2013
$2,851/kW
Est. Construction Cost
Total estimated cost: $130.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesGeothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Terra-Gen VG Wind LLC
Data-driven briefing on Terra-Gen — fleet, generation, financial, and news signals.
Ormesa III
Data-driven briefing on Ormesa III — fleet, generation, financial, and news signals.
Geothermal 1
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.