11.7 MW Wind operating in Riverside, CA
11.7 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
1985
Operating Since
Coordinates
33.9210, -116.5583
County
Riverside, CA
Nearby Plants
Forward-looking, asset-specific exposure profile combining climate hazards, generation variability, and counterparty risk into a single decision-grade signal.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | San Gorgonio Farms Inc | San Gorgonio Farms Inc | — |
| Owner(s) | San Gorgonio Farms Inc | San Gorgonio Farms Inc | — |
| Status | Operating | operating | — |
GEM identifies the owner as San Gorgonio Farms Inc
This entity is not yet in the GEM ownership database — chain unavailable.
The Karen Avenue Wind Farm is a wind power plant located in Riverside County, California. The plant has a total capacity of 11.7 MW and began operating in 1985. It is owned and operated by San Gorgonio Farms Inc. The facility consists of a single generator utilizing onshore wind turbine technology. The plant's location places it within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region.
The wind farm's latest annual generation was 23,382 MWh, resulting in a capacity factor of 22.8%. The plant utilizes Vestas V39 wind turbines, characterized by a rotor diameter of 42 meters and a hub height of 40 meters. In terms of size, the Karen Avenue Wind Farm ranks 83rd out of 116 wind plants in California and 1128th out of 1424 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
596 MWh
Latest Month
23.4K MWh
Annual Generation
22.8%
Capacity Factor
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $22.2M
Market Position
ISO/RTO Market
CAISO
LMP Node
GARNET_2_WIND2
Pricing Hub
TH_SP15_GEN-APND
Node Source
EIA-860 direct report
Last updated 2026-03-14