Search plants, projects, owners, and states
5.7 MW Hydro operating in Lewis, NY
5.7 MW
Nameplate Capacity
3
Generators
units
Conventional Hydroelectric
Technology
1984
Operating Since
Coordinates
43.5912, -75.3442
County
Lewis, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Central Rivers Power US, LLC | — | — |
| Owner(s) | Central Rivers Power US, LLC | — | — |
| Status | Operating | — | — |
Black River Hydro Associates is a 5.7 MW hydroelectric power plant located in Lewis County, New York. The plant began operating in 1984 and utilizes conventional hydroelectric technology. It consists of 3 generators and is owned and operated by Central Rivers Power US, LLC. The primary fuel source for electricity generation is water (WAT).
In the most recent year of data, Black River Hydro Associates generated 23,424 MWh of electricity, achieving a capacity factor of 46.8%. The plant is located within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. Black River Hydro Associates ranks 69th out of 165 power plants in New York and 837th out of 1464 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
24.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
1.7K MWh
Latest Month
23.4K MWh
Annual Generation
46.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $13.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
BURROWS___LYONSDAL
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone E
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Black River Hydro Associates