85 MW Black Liquor operating in Jefferson, AR
85 MW
Nameplate Capacity
3
Generators
units
Wood/Wood Waste Biomass
Technology
1958
Operating Since
Coordinates
34.2206, -91.9069
County
Jefferson, AR
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Suzano Packaging LLC | Evergreen Packaging | — |
| Owner(s) | Suzano Packaging LLC | Pactiv Evergreen | — |
| Status | Operating | operating | — |
Pine Bluff Mill is an 85 MW biomass power plant located in Jefferson County, Arkansas. The plant, which primarily burns wood and wood waste, began operating in 1958 and consists of three generators. It is owned by Pactiv Evergreen and operated by Suzano Packaging LLC. The plant's primary fuel source is listed as BLQ, a code used by the Energy Information Administration for biomass byproducts.
In the most recent year with available data, Pine Bluff Mill generated 289,037 MWh of electricity, achieving a capacity factor of 38.8%. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the SERC Reliability Corporation NERC region. Among biomass plants in Arkansas, Pine Bluff Mill ranks as the second largest of three such facilities in the state, and it is the 20th largest of 66 biomass plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
30.0K MWh
Latest Month
289.0K MWh
Annual Generation
38.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
176 lb/MWh
NOx
0.769 lb/MWh
SO₂
3 lb/MWh
CH₄
0.034 lb/MWh
N₂O
0.021 lb/MWh
Capacity Factor
38.8%
Annual Net Gen
289 GWh
CO₂eq
183 lb/MWh
Subregion
SERC Mississippi Valley
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $297.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
EAILD
Pricing Hub
ARKANSAS.HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Pine Bluff MillForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Pactiv Evergreen signed definitive agreement to sell Pine Bluff, AR paper mill and Waynesville, NC extrusion facility to Suzano for a combined $110M; deal closed in Q3/Q4 2024.