8.2 MW Hydro operating in St Lawrence, NY
8.2 MW
Nameplate Capacity
3
Generators
units
Conventional Hydroelectric
Technology
1949
Operating Since
Coordinates
44.5220, -75.1881
County
St Lawrence, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Central Rivers Power US, LLC | — | — |
| Owner(s) | Central Rivers Power US, LLC | — | — |
| Status | Operating | — | — |
The Pyrites Plant is a hydroelectric generating station located in St. Lawrence County, New York. The plant has a total capacity of 8.2 MW consisting of 3 generators utilizing conventional hydroelectric technology. It began operating in 1949 and is owned and operated by Central Rivers Power US, LLC. The plant's primary fuel source is water (WAT).
In the most recent year of reported data, the Pyrites Plant generated 25,288 MWh of electricity, achieving a capacity factor of 35.1%. The plant operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. Based on capacity, the Pyrites Plant ranks as the 49th largest out of 165 power plants in New York state, and 723rd out of 1464 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
23.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
2.2K MWh
Latest Month
25.3K MWh
Annual Generation
35.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $18.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
PYRITES___HYD
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone E
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Pyrites PlantForward forecasts, scenario decomposition, and risk-decision tooling for this asset.