Search plants, projects, owners, and states
102.6 MW Black Liquor operating in Oxford, ME
102.6 MW
Nameplate Capacity
1
Generators
unit
Wood/Wood Waste Biomass
Technology
1990
Operating Since
Coordinates
44.5525, -70.5428
County
Oxford, ME
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | ND Paper, Inc. | ND Paper Inc | — |
| Owner(s) | ND Paper, Inc. | Nine Dragons Global Investments | — |
| Status | Operating | operating | — |
Rumford Cogeneration is a 102.6 MW biomass-fueled power plant located in Oxford County, Maine. The plant began operating in 1990 and has one generator. It is owned by Nine Dragons Global Investments, a company based in Hong Kong, and operated by ND Paper, Inc. The plant utilizes wood and wood waste biomass as its primary fuel source.
In the most recent year of reported data, Rumford Cogeneration generated 423,927 MWh of electricity, achieving a capacity factor of 47.2%. The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. It is the second-largest biomass plant in Maine, and ranks twelfth nationally among plants using this fuel type.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
48.5K MWh
Latest Month
423.9K MWh
Annual Generation
47.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
371 lb/MWh
NOx
1 lb/MWh
SO₂
0.151 lb/MWh
CH₄
0.202 lb/MWh
N₂O
0.036 lb/MWh
Capacity Factor
45.5%
Annual Net Gen
409 GWh
CO₂eq
387 lb/MWh
Subregion
NPCC New England
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $358.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ISO-NE
LMP Node
NPCC/ISO New England/345 Catalyst 115
Pricing Hub
.Z.MAINE
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Rumford CogenerationForward forecasts, scenario decomposition, and risk-decision tooling for this asset.