39.6 MW Wood Waste operating in Androscoggin, ME
39.6 MW
Nameplate Capacity
1
Generators
unit
Wood/Wood Waste Biomass
Technology
1992
Operating Since
Coordinates
44.4305, -70.1617
County
Androscoggin, ME
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | ReEnergy Livermore Falls | Regenerate Livermore Falls | — |
| Owner(s) | ReEnergy Livermore Falls | Ember Infrastructure Management | — |
| Status | Operating | operating | — |
ReEnergy Livermore Falls is a 39.6 MW biomass power plant located in Androscoggin County, Maine. The plant began operating in 1992 and is owned by Ember Infrastructure Management, with ReEnergy Livermore Falls listed as the operator. The facility utilizes wood and wood waste as its primary fuel source. It consists of a single generator.
The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In the state of Maine, it ranks as the second largest of six biomass plants, and nationally it is the 31st largest out of 97 such facilities. The plant's latest annual generation was 266,800 MWh, achieving a capacity factor of 76.7%.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
28.0K MWh
Latest Month
266.8K MWh
Annual Generation
76.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.909 lb/MWh
SO₂
0.326 lb/MWh
CH₄
0.919 lb/MWh
N₂O
0.121 lb/MWh
Capacity Factor
64.2%
Annual Net Gen
223 GWh
CO₂eq
58 lb/MWh
Subregion
NPCC New England
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $138.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
ReEnergy Livermore Falls Substation · 115 kV
Substation Distance
< 10 km
Operator
ReEnergy Livermore Falls
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
Maine
Pricing Hub
.Z.MAINE
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about ReEnergy Livermore FallsForward forecasts, scenario decomposition, and risk-decision tooling for this asset.