Search plants, projects, owners, and states
2.6 MW Hydro operating in Hood River, OR
2.6 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
2015
Operating Since
Coordinates
45.6652, -121.5238
County
Hood River, OR
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Farmer's Irrigation District | — | — |
| Owner(s) | Farmer's Irrigation District | — | — |
| Status | Operating | — | — |
Copper Dam Plant is a hydroelectric generating facility located in Hood River County, Oregon. The plant has a total capacity of 2.6 MW and is operated by Farmer's Irrigation District. It commenced operations in 2015 and utilizes a single generator with conventional hydroelectric technology, drawing its primary fuel source from water (WAT). The plant is located within the PacifiCorp - West balancing authority area and the Western Electricity Coordinating Council (WECC) NERC region.
In the most recent year of data, Copper Dam Plant generated 16,363 MWh of electricity, achieving a capacity factor of 71.8%. In terms of size, the plant is ranked 53 out of 63 hydroelectric facilities in the state of Oregon, and 1132 out of 1464 nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
PacifiCorp - West (PACW)
Grid Voltage
4.3 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Political Subdivision
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
1.7K MWh
Latest Month
16.4K MWh
Annual Generation
71.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2015
$580/kW
Est. Construction Cost
Total estimated cost: $1.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Copper Dam PlantForward forecasts, scenario decomposition, and risk-decision tooling for this asset.