20 MW Wood Waste operating in Grafton, NH
20 MW
Nameplate Capacity
1
Generators
unit
Wood/Wood Waste Biomass
Technology
1987
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
43.7150, -71.6582
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Grafton, NH
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
2 mapped line sections connect the two facilities over 2.992 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Bridgewater Power Co LP | — | — |
| Owner(s) | Bridgewater Power Co LP, Olympus Power | — | — |
| Status | Operating | — | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Bridgewater Power LP is a 20 MW biomass power plant located in Grafton County, New Hampshire. The plant began operating in 1987 and utilizes wood and wood waste as its primary fuel source. It consists of a single generator and is operated by Bridgewater Power Co LP. The plant is interconnected to the ISO New England Inc. balancing authority and is within the Northeast Power Coordinating Council (NPCC) NERC region.
In the most recent year with available data, Bridgewater Power LP generated 93,032 MWh of electricity, achieving a capacity factor of 53.0%. The plant ranks as the 3rd largest of 6 biomass facilities in New Hampshire, and 58th out of 97 such plants nationally.
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
36.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
10.1K MWh
Latest Month
93.0K MWh
Annual Generation
53.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
6 lb/MWh
NOx
1 lb/MWh
SO₂
0.394 lb/MWh
CH₄
1 lb/MWh
N₂O
0.146 lb/MWh
Capacity Factor
62.3%
Annual Net Gen
109 GWh
CO₂eq
76 lb/MWh
Subregion
NPCC New England
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $69.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.ASHLAND 34.5
Pricing Hub
.Z.NEWHAMPSHIRE
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Oxy Renewable Energy queue pipeline — 1 projects by technology and status
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ISO New England
Summary analysis with parallel narrative sections and visualizations.
Bridgewater Power LP
Data-driven briefing on Bridgewater Power LP — fleet, generation, financial, and news signals.
DG AMP Solar Bowling Green
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.