20 MW Wood Waste operating in Grafton, NH
20 MW
Nameplate Capacity
1
Generators
unit
Wood/Wood Waste Biomass
Technology
1987
Operating Since
Coordinates
43.7150, -71.6582
County
Grafton, NH
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Bridgewater Power Co LP | — | — |
| Owner(s) | Bridgewater Power Co LP, Olympus Power | — | — |
| Status | Operating | — | — |
Bridgewater Power LP is a 20 MW biomass power plant located in Grafton County, New Hampshire. The plant began operating in 1987 and utilizes wood and wood waste as its primary fuel source. It consists of a single generator and is operated by Bridgewater Power Co LP. The plant is interconnected to the ISO New England Inc. balancing authority and is within the Northeast Power Coordinating Council (NPCC) NERC region.
In the most recent year with available data, Bridgewater Power LP generated 93,032 MWh of electricity, achieving a capacity factor of 53.0%. The plant ranks as the 3rd largest of 6 biomass facilities in New Hampshire, and 58th out of 97 such plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
36.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
10.1K MWh
Latest Month
93.0K MWh
Annual Generation
53.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
6 lb/MWh
NOx
1 lb/MWh
SO₂
0.394 lb/MWh
CH₄
1 lb/MWh
N₂O
0.146 lb/MWh
Capacity Factor
62.3%
Annual Net Gen
109 GWh
CO₂eq
76 lb/MWh
Subregion
NPCC New England
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $69.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.ASHLAND 34.5
Pricing Hub
.Z.NEWHAMPSHIRE
Location Type
NETWORK NODE
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Bridgewater Power LPForward forecasts, scenario decomposition, and risk-decision tooling for this asset.