Search plants, projects, owners, and states
6.7 MW Hydro operating in Clinton, NY
6.7 MW
Nameplate Capacity
3
Generators
units
Conventional Hydroelectric
Technology
1990
Operating Since
Coordinates
44.6691, -73.4921
County
Clinton, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Central Rivers Power US, LLC | — | — |
| Owner(s) | Central Rivers Power US, LLC | — | — |
| Status | Operating | — | — |
The Lower Saranac Hydroelectric Facility is a 6.7 MW conventional hydroelectric plant located in Clinton County, New York. The plant began operating in 1990 and is owned and operated by Central Rivers Power US, LLC. It consists of three generators utilizing water (WAT) as its primary fuel source. The facility is connected to the New York Independent System Operator (NYISO) balancing authority and is within the Northeast Power Coordinating Council (NPCC) NERC region.
In the most recent year of data, the Lower Saranac Hydroelectric Facility generated 10,859 MWh of electricity, achieving a capacity factor of 18.5%. The plant ranks 58th out of 165 hydroelectric facilities in New York State based on capacity, and 787th nationally out of 1464 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
46.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
942 MWh
Latest Month
10.9K MWh
Annual Generation
18.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $15.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
FALCON___SEABRD_CC1
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NORTH
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Lower Saranac Hydroelectric FacilityForward forecasts, scenario decomposition, and risk-decision tooling for this asset.