Search plants, projects, owners, and states
25 MW Natural Gas operating in Yazoo, MS
25 MW
Nameplate Capacity
1
Generators
unit
Natural Gas Fired Combustion Turbine
Technology
1984
Operating Since
Coordinates
32.9040, -90.3783
County
Yazoo, MS
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | CF Industries Nitrogen LLC | — | — |
| Owner(s) | CF Industries Nitrogen LLC | — | — |
| Status | Operating | — | — |
The CF Industries Yazoo City Complex is a 25 MW natural gas-fired combustion turbine power plant located in Yazoo County, Mississippi. The plant began operating in 1984 and has one generator. It is owned and operated by CF Industries Nitrogen LLC. The plant is ranked 26th out of 30 power plants in Mississippi, and 1271st out of 1963 plants nationally.
The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority, within the SERC Reliability Corporation NERC region. In the most recent year with available data, the plant generated 140,352 MWh of electricity, achieving a capacity factor of 64.1%.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
Industrial CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
6.6K MWh
Latest Month
140.4K MWh
Annual Generation
64.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
665 lb/MWh
NOx
2 lb/MWh
SO₂
0.018 lb/MWh
CH₄
0.013 lb/MWh
N₂O
0.001 lb/MWh
Capacity Factor
73.2%
Annual Net Gen
160 GWh
CO₂eq
665 lb/MWh
Subregion
SERC Mississippi Valley
2013
$965/kW
Est. Construction Cost
Total estimated cost: $24.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
U EES MSCHEM G1
Pricing Hub
MS.HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all 6 articlesNo Ask reports yet for this entity.
Ask about CF Industries Yazoo City ComplexForward forecasts, scenario decomposition, and risk-decision tooling for this asset.