8.2 MW Natural Gas operating in Polk, FL
8.2 MW
Nameplate Capacity
2
Generators
units
Natural Gas Fired Combustion Turbine
Technology
2015
Operating Since
Coordinates
28.0548, -81.7982
County
Polk, FL
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cutrale Citrus Juices USA Inc | — | — |
| Owner(s) | Cutrale Citrus Juices USA Inc | — | — |
| Status | Operating | — | — |
Cutrale Citrus Juices USA II is an 8.2 MW natural gas-fired power plant located in Polk County, Florida. The plant began operating in 2015 and consists of two natural gas-fired combustion turbine generators. It is owned and operated by Cutrale Citrus Juices USA Inc. The plant is located within the Tampa Electric Company balancing authority and the SERC NERC region.
In its most recent year of operation, Cutrale Citrus Juices USA II generated 33,675 MWh of electricity, achieving a capacity factor of 46.7%. The plant's relatively small size results in a ranking of 66 out of 68 power plants in Florida, and 1479 out of 1963 plants nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Tampa Electric Company (TEC)
Grid Voltage
13.6 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
2.2K MWh
Latest Month
33.7K MWh
Annual Generation
46.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1823 lb/MWh
NOx
5 lb/MWh
SO₂
0.050 lb/MWh
CH₄
0.034 lb/MWh
N₂O
0.003 lb/MWh
Capacity Factor
46.5%
Annual Net Gen
33 GWh
CO₂eq
1825 lb/MWh
Subregion
FRCC All
2015
$812/kW
Est. Construction Cost
Total estimated cost: $6.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Cutrale Citrus Juices USA IIForward forecasts, scenario decomposition, and risk-decision tooling for this asset.