4.3 MW Hydro operating in Cherokee, SC
4.3 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1985
Operating Since
Coordinates
35.0639, -81.5458
County
Cherokee, SC
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Hydroland Omega LLC | — | — |
| Owner(s) | Cherokee Falls Hydroelectric Project, LLC | — | — |
| Status | Operating | — | — |
Cherokee Falls is a hydroelectric power plant located in Cherokee County, South Carolina. The plant has a total capacity of 4.3 MW and began operating in 1985. It is owned and operated by Hydroland Omega LLC. The plant utilizes a single generator and conventional hydroelectric technology, using water (WAT) as its primary fuel source. Cherokee Falls is ranked as the 22nd largest hydroelectric plant in South Carolina out of 33, and 937th nationally out of 1464.
The plant operates within the Duke Energy Carolinas balancing authority and the SERC NERC region.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Duke Energy Carolinas (DUK)
Grid Voltage
15.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $9.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Cherokee FallsForward forecasts, scenario decomposition, and risk-decision tooling for this asset.