Search plants, projects, owners, and states
1.3 MW Hydro standby in Riverside, CA
1.3 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1986
Operating Since
Coordinates
33.9347, -116.6406
County
Riverside, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Desert Water Agency | — | — |
| Owner(s) | Desert Water Agency | — | — |
| Status | Standby | — | — |
The Whitewater Hydro Plant is a 1.3 MW hydroelectric generating facility located in Riverside County, California. The plant began operating in 1986 and has a single generator utilizing conventional hydroelectric technology. It is owned and operated by the Desert Water Agency.
The plant's location within California places it in the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, Whitewater Hydro ranks as the 234th largest power plant in California out of 247, and 1365th nationally out of 1464. The plant's latest annual generation was 4,687 MWh, equating to a capacity factor of 40.9%.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
4.16 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Municipal
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
4.7K MWh
Annual Generation
40.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $3.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
GARNET_7_N017
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Whitewater Hydro PlantForward forecasts, scenario decomposition, and risk-decision tooling for this asset.