3.4 MW Hydro operating in St Lawrence, NY
3.4 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1987
Operating Since
Coordinates
44.2966, -75.3662
County
St Lawrence, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Hampshire Paper Co Inc | — | — |
| Owner(s) | Hampshire Paper Co Inc | — | — |
| Status | Operating | — | — |
Hampshire Paper is a hydroelectric power plant located in St. Lawrence County, New York. The plant, owned and operated by Hampshire Paper Co Inc, has a total capacity of 3.4 MW. It began operating in 1987 and consists of a single generator utilizing conventional hydroelectric technology. The plant's primary fuel source is water (WAT).
In the most recent year of data, Hampshire Paper generated 12,064 MWh of electricity, achieving a capacity factor of 40.2%. The plant operates within the New York Independent System Operator (NYISO) balancing authority and is part of the Northeast Power Coordinating Council (NPCC) NERC region. Hampshire Paper ranks as the 98th largest power plant in New York out of 165, and nationally it is ranked 1027 out of 1464 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
23.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
1.1K MWh
Latest Month
12.1K MWh
Annual Generation
40.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $7.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone D
Node Source
Plant coordinates only
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Hampshire PaperForward forecasts, scenario decomposition, and risk-decision tooling for this asset.