Search plants, projects, owners, and states
5 MW Natural Gas operating in Rockingham, NH
5 MW
Nameplate Capacity
1
Generators
unit
Natural Gas Fired Combustion Turbine
Technology
2000
Operating Since
Coordinates
42.9383, -70.8406
County
Rockingham, NH
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Foss Manufacturing Company LLC | — | — |
| Owner(s) | Foss Manufacturing Company LLC | — | — |
| Status | Operating | — | — |
The Hampton Facility is a 5 MW natural gas-fired combustion turbine power plant located in Rockingham County, New Hampshire. It began operating in 2000 and is owned and operated by Foss Manufacturing Company LLC. The plant has one generator.
The Hampton Facility operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In the most recent year of data, the plant generated 26,095 MWh of electricity, achieving a capacity factor of 59.6%. The plant is ranked as the 4th largest of 4 plants in New Hampshire, and 1577th out of 1963 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
Industrial CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
1.8K MWh
Latest Month
26.1K MWh
Annual Generation
59.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
710 lb/MWh
NOx
2 lb/MWh
SO₂
0.019 lb/MWh
CH₄
0.013 lb/MWh
N₂O
0.001 lb/MWh
Capacity Factor
62.3%
Annual Net Gen
27 GWh
CO₂eq
710 lb/MWh
Subregion
NPCC New England
2013
$965/kW
Est. Construction Cost
Total estimated cost: $4.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.TIMBER 34.5
Pricing Hub
.Z.NEWHAMPSHIRE
Location Type
NETWORK NODE
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Hampton FacilityForward forecasts, scenario decomposition, and risk-decision tooling for this asset.