4.4 MW Distillate Oil operating in Mercer, PA
4.4 MW
Nameplate Capacity
1
Generators
unit
Petroleum Liquids
Technology
1984
Operating Since
Coordinates
41.1694, -80.1055
County
Mercer, PA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | General Electric Co | General Electric | — |
| Owner(s) | General Electric Co | General Electric | — |
| Status | Operating | — | — |
The Wabtec U.S Rail, Grove City Engine Plant is a 4.4 MW diesel-fueled power plant located in Mercer County, Pennsylvania. The plant began operating in 1984 and has one generator utilizing petroleum liquids technology. It is owned and operated by General Electric Co, a subsidiary of General Electric.
In the most recent year of data, the plant generated 4,819 MWh of electricity, achieving a capacity factor of 12.5%. The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. It is ranked as the 27th largest of 31 petroleum-fueled plants in Pennsylvania, and 576th of 886 similar plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
12.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
127 MWh
Latest Month
4.8K MWh
Annual Generation
12.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
9795 lb/MWh
NOx
193 lb/MWh
SO₂
17 lb/MWh
CH₄
0.397 lb/MWh
N₂O
0.079 lb/MWh
Capacity Factor
7.3%
Annual Net Gen
3 GWh
CO₂eq
9827 lb/MWh
Subregion
RFC West
2013
$765/kW
Est. Construction Cost
Total estimated cost: $3.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
GROVECTY69 KV CAROKASP
Pricing Hub
WESTERN HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Wabtec U.S Rail, Grove City Engine PlantForward forecasts, scenario decomposition, and risk-decision tooling for this asset.