Search plants, projects, owners, and states
3.2 MW Bio. Gas operating in San Diego, CA
3.2 MW
Nameplate Capacity
4
Generators
units
Other Waste Biomass
Technology
2008
Operating Since
Coordinates
33.1165, -117.3215
County
San Diego, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Encina Joint Powers Authority | — | — |
| Owner(s) | Encina Joint Powers Authority | — | — |
| Status | Operating | — | — |
Encina Water Pollution Control is a 3.2 MW power plant located in San Diego County, California. The plant, which began operating in 2008, is owned and operated by the Encina Joint Powers Authority. It utilizes other waste biomass (OBG) as its primary fuel source and consists of 4 generators. The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region.
In the most recent year of data, Encina Water Pollution Control generated 14,281 MWh of electricity, achieving a capacity factor of 50.9%. Among similar plants in California, Encina Water Pollution Control ranks 11th out of 33 in terms of capacity. Nationally, it ranks 28th out of 74.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
1.2K MWh
Latest Month
14.3K MWh
Annual Generation
50.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
64 lb/MWh
NOx
46 lb/MWh
SO₂
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $11.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_SP15_GEN-APND
Node Source
Shared substation inference
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Encina Water Pollution ControlForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demoCalifornia Independent System Operator (CISO)
Grid Voltage
12.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Municipal
Sector
Commercial Non-CHP
0.071 lb/MWh
CH₄
0.025 lb/MWh
N₂O
0.003 lb/MWh
Capacity Factor
51.2%
Annual Net Gen
14 GWh
CO₂eq
65 lb/MWh
Subregion
WECC California