Search plants, projects, owners, and states
17.4 MW Wind out of service in Merced, CA
17.4 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
1988
Operating Since
Coordinates
37.0417, -121.1787
County
Merced, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | International Turbine Res Inc | International Turbine Research | — |
| Owner(s) | International Turbine Res Inc | International Turbine Research | — |
| Status | Out of service | operating | — |
GEM identifies the owner as International Turbine Research
This entity is not yet in the GEM ownership database — chain unavailable.
Dinosaur Point is a 17.4 MW wind power plant located in Merced County, California. The plant began operating in 1988 and has one generator utilizing onshore wind turbine technology. The owner and operator is International Turbine Res Inc. Dinosaur Point is connected to the California Independent System Operator (CAISO) balancing authority and is within the Western Electricity Coordinating Council (WECC) NERC region.
In its latest year of reported generation, Dinosaur Point produced 1,168 MWh of electricity, achieving a capacity factor of 0.8%. The plant ranks 78th out of 116 power plants in California and 1104th out of 1424 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
70.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
0 MWh
Latest Month
1.2K MWh
Annual Generation
0.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $33.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
INTLTUR_6_B1
Pricing Hub
TH_ZP26_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
Last updated 2026-03-26
View all 5 articlesNo Ask reports yet for this entity.
Ask about Dinosaur PointForward forecasts, scenario decomposition, and risk-decision tooling for this asset.