# Interconnection Queue Projects in MISO (Midcontinent) > Open data on active interconnection queue projects in this segment, cross-referenced from LBNL and the seven U.S. ISO/RTO queues. Part of the open foundation underneath InfraSure's analytical layer. 1,856 queue projects · 407,107 MW proposed · across 15 states Top technologies: Solar (695 projects, 122,430 MW); Battery (361 projects, 60,694 MW); Other (338 projects, 85,568 MW); Wind (194 projects, 40,155 MW); Solar+Battery (133 projects, 26,059 MW). Top developers: Entergy Louisiana, LLC (6); Xcel Energy (5); NIPSCO (4); Interstate Power and Light Company (IPL) (4); DTE Energy (4). ## Top 200 projects by capacity (of 1,856 total) Format: name | capacity | technology | state | developer | url - Schahfer CCGTs | 2740 MW | Gas | IN | NIPSCO | https://www.infrasure.ai/project/miso-e0042-schahfer-ccgts - MISO-J3996 | 2220 MW | Gas | MO | — | https://www.infrasure.ai/project/miso-j3996 - MISO-J4241 | 2220 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4241 - MISO-J4256 | 2015 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4256 - Richland Parish generators | 1640 MW | Gas | LA | Entergy Louisiana, LLC | https://www.infrasure.ai/project/miso-e0044-richland-parish-generators - Franklin Farms | 1640 MW | Gas | LA | Entergy Louisiana, LLC | https://www.infrasure.ai/project/miso-e0014-franklin-farms - Richland Parish generators | 1640 MW | Gas | LA | Entergy Louisiana, LLC | https://www.infrasure.ai/project/miso-e0043-richland-parish-generators - MISO-J3999 | 1540 MW | Gas | IN | — | https://www.infrasure.ai/project/miso-j3999 - MISO-J4216 | 1500 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4216 - MISO-J4219 | 1500 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4219 - MISO-J4221 | 1500 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4221 - MISO-J4024 | 1499 MW | Gas | MI | — | https://www.infrasure.ai/project/miso-j4024 - MISO-J4025 | 1499 MW | Gas | MI | — | https://www.infrasure.ai/project/miso-j4025 - MISO-J3799 | 1452 MW | Gas | MI | — | https://www.infrasure.ai/project/miso-j3799 - MISO-J3922 | 1445 MW | Gas | MI | — | https://www.infrasure.ai/project/miso-j3922 - MISO-J4409 | 1440 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4409 - MISO-J4296 | 1440 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4296 - MISO-J4331 | 1435 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4331 - MISO-J3923 | 1414 MW | Gas | MI | — | https://www.infrasure.ai/project/miso-j3923 - MISO-J4113 | 1315 MW | Gas | IA | — | https://www.infrasure.ai/project/miso-j4113 - MISO-J3935 | 1268 MW | Gas | MI | — | https://www.infrasure.ai/project/miso-j3935 - Replacing 464.5 MW Steam/Gas with 97.8 MW Steam; DOW Chem | 1232 MW | Gas | LA | — | https://www.infrasure.ai/project/miso-r1048-replacing-464-5-mw-steam-gas-with-97-8-mw-steam-dow-chem - MISO-E0016 | 1211 MW | Gas | WI | Invenergy | https://www.infrasure.ai/project/miso-e0016 - Red Oak Ridge Energy Center | 1211 MW | Gas | WI | Invenergy | https://www.infrasure.ai/project/miso-e0012-red-oak-ridge-energy-center - MISO-J4165 | 1203 MW | Gas | WI | — | https://www.infrasure.ai/project/miso-j4165 - MISO-J4164 | 1203 MW | Gas | WI | — | https://www.infrasure.ai/project/miso-j4164 - MISO-J4014 | 1203 MW | Gas | WI | — | https://www.infrasure.ai/project/miso-j4014 - Replace 1163.3 MW of Sabine Units 3, 4 & 1 with 2 on 1 Combined Cycle Gas Turbine facility; Sabine 1 | 1166 MW | Gas | TX | — | https://www.infrasure.ai/project/miso-r1003-replace-1163-3-mw-of-sabine-units-3-4-1-with-2-on-1-combined-cycle-gas-turbine-facility-sabine-1 - MISO-J955 | 1165 MW | Gas | IL | — | https://www.infrasure.ai/project/miso-j955 - MISO-J3941 | 1144 MW | Gas | SD | — | https://www.infrasure.ai/project/miso-j3941 - Replacement; Oak Creek Units 5-8 | 1138 MW | Gas | WI | — | https://www.infrasure.ai/project/miso-r1053-replacement-oak-creek-units-5-8 - Malden CCGT | 1090 MW | Gas | IN | NIPSCO | https://www.infrasure.ai/project/miso-e0035-malden-ccgt - Replacing 1014.7 MW of coal generation with Gas/Steam; Cayuga CC1 CC2 | 1040 MW | Gas | IN | — | https://www.infrasure.ai/project/miso-r1044-replacing-1014-7-mw-of-coal-generation-with-gas-steam-cayuga-cc1-cc2 - MISO-J1813 | 1005 MW | Gas | MS | — | https://www.infrasure.ai/project/miso-j1813 - MISO-J4264 | 1000 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4264 - MISO-J1490 | 1000 MW | Other | MO | — | https://www.infrasure.ai/project/miso-j1490 - MISO-E0050 | 987 MW | Gas | IA | Interstate Power and Light Company (IPL) | https://www.infrasure.ai/project/miso-e0050 - MISO-J4342 | 976 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4342 - MISO-J4324 | 976 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4324 - MISO-J4298 | 976 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4298 - MISO-J4116 | 950 MW | Gas | WI | — | https://www.infrasure.ai/project/miso-j4116 - MISO-J4369 | 950 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4369 - Replacing 864 MW of coal with Natural Gas Generators; Castle Bluff | 824 MW | Gas | MO | — | https://www.infrasure.ai/project/miso-r1047-replacing-864-mw-of-coal-with-natural-gas-generators-castle-bluff - MISO-J2186 | 821 MW | Solar | IL | — | https://www.infrasure.ai/project/miso-j2186 - MISO-E0030 | 820 MW | Gas | TX | Entergy Texas, Inc. | https://www.infrasure.ai/project/miso-e0030 - Vicksburg CCCT | 820 MW | Gas | MS | Entergy Mississippi, LLC | https://www.infrasure.ai/project/miso-e0031-vicksburg-ccct - Lakeover CCCT | 820 MW | Gas | MS | Entergy Mississippi, LLC | https://www.infrasure.ai/project/miso-e0047-lakeover-ccct - MISO-J4138 | 805 MW | Gas | LA | — | https://www.infrasure.ai/project/miso-j4138 - MISO-J4191 | 805 MW | Gas | LA | — | https://www.infrasure.ai/project/miso-j4191 - MISO-J4218 | 800 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4218 - MISO-J4217 | 800 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4217 - MISO-E0010 | 798 MW | Gas | IA | Interstate Power and Light Company (IPL) | https://www.infrasure.ai/project/miso-e0010 - MISO-E0049 | 798 MW | Gas | IA | Interstate Power and Light Company (IPL) | https://www.infrasure.ai/project/miso-e0049 - MISO-J4258 | 787 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4258 - MISO-E0048 | 775 MW | Gas | LA | Entergy | https://www.infrasure.ai/project/miso-e0048 - MISO-J4245 | 770 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4245 - MISO-J4175 | 770 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4175 - Entergy Louisiana LRZ 9 Generation Resource | 770 MW | Gas | LA | Entergy Louisiana, LLC | https://www.infrasure.ai/project/miso-e0045-entergy-louisiana-lrz-9-generation-resource - MISO-J3874 | 770 MW | Gas | AR | — | https://www.infrasure.ai/project/miso-j3874 - MISO-J4384 | 770 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4384 - MISO-J3829 | 770 MW | Gas | AR | — | https://www.infrasure.ai/project/miso-j3829 - MISO-J4339 | 770 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4339 - MISO-J4299 | 770 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4299 - MISO-J4295 | 770 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4295 - MISO-J4286 | 770 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4286 - MISO-J4239 | 770 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4239 - MISO-J4184 | 755 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4184 - MISO-J4185 | 755 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4185 - MISO-J4180 | 755 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4180 - MISO-J4178 | 755 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4178 - MISO-J4187 | 755 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4187 - Replacing 749 MW of coal generation with BESS; Campbell 3 | 749 MW | Battery | MI | — | https://www.infrasure.ai/project/miso-r1040-replacing-749-mw-of-coal-generation-with-bess-campbell-3 - MISO-J4177 | 735 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4177 - MISO-J4040 | 735 MW | Nuclear | MI | — | https://www.infrasure.ai/project/miso-j4040 - MISO-J4179 | 735 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4179 - MISO-J1246 | 725 MW | Gas | LA | — | https://www.infrasure.ai/project/miso-j1246 - MISO-J4307 | 720 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4307 - MISO-J351 | 715 MW | Gas | IN | — | https://www.infrasure.ai/project/miso-j351 - Replacing 710 MW of coal generation with solar at Sherco Unit 2; Sherco Unit 2 | 710 MW | Solar | MN | — | https://www.infrasure.ai/project/miso-r1036-replacing-710-mw-of-coal-generation-with-solar-at-sherco-unit-2-sherco-unit-2 - MISO-J2846 | 700 MW | Solar | IN | — | https://www.infrasure.ai/project/miso-j2846 - MISO-J4159 | 664 MW | Gas | MI | — | https://www.infrasure.ai/project/miso-j4159 - MISO-J3604 | 650 MW | Gas | IN | — | https://www.infrasure.ai/project/miso-j3604 - MISO-J3932 | 646 MW | Nuclear | IA | — | https://www.infrasure.ai/project/miso-j3932 - MISO-J3084 | 642 MW | Gas | IN | — | https://www.infrasure.ai/project/miso-j3084 - MISO-S1156 | 632 MW | Other | TX | — | https://www.infrasure.ai/project/miso-s1156 - Malden BESS | 630 MW | Battery | IN | NIPSCO | https://www.infrasure.ai/project/miso-e0039-malden-bess - MISO-J2262 | 625 MW | Solar | AR | — | https://www.infrasure.ai/project/miso-j2262 - MISO-S1161 | 625 MW | Other | AR | — | https://www.infrasure.ai/project/miso-s1161 - MISO-J2261 | 625 MW | Solar | AR | — | https://www.infrasure.ai/project/miso-j2261 - Replacing 615 MW Coal with 615 MW BESS; Campbell Units 1 & 2 | 615 MW | Battery | — | — | https://www.infrasure.ai/project/miso-r1052-replacing-615-mw-coal-with-615-mw-bess-campbell-units-1-2 - MISO-J2519 | 600 MW | Solar | LA | — | https://www.infrasure.ai/project/miso-j2519 - MISO-J2477 | 600 MW | Solar | AR | — | https://www.infrasure.ai/project/miso-j2477 - MISO-R5086 | 593 MW | Battery | LA | — | https://www.infrasure.ai/project/miso-r5086 - MISO-J732 | 562 MW | Gas | WI | — | https://www.infrasure.ai/project/miso-j732 - MISO-J3075 | 560 MW | Solar+Battery | IN | — | https://www.infrasure.ai/project/miso-j3075 - MISO-IP17 | 550 MW | Coal | IL | — | https://www.infrasure.ai/project/miso-ip17 - Surplus; Big Bend | 550 MW | Wind | MN | — | https://www.infrasure.ai/project/miso-s1054-surplus-big-bend - MISO-J2478 | 550 MW | Solar | AR | — | https://www.infrasure.ai/project/miso-j2478 - MISO-J4102 | 539 MW | Solar | MI | — | https://www.infrasure.ai/project/miso-j4102 - MISO-S1157 | 534 MW | Other | TX | — | https://www.infrasure.ai/project/miso-s1157 - Merom Station | 530 MW | Battery | IN | Hallador Power | https://www.infrasure.ai/project/miso-e0054-merom-station - Mitchell BESS | 527 MW | Battery | IN | NIPSCO | https://www.infrasure.ai/project/miso-e0033-mitchell-bess - MISO-J4114 | 525 MW | Gas | IA | — | https://www.infrasure.ai/project/miso-j4114 - MISO-J4115 | 525 MW | Gas | WI | — | https://www.infrasure.ai/project/miso-j4115 - MISO-J4406 | 524 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4406 - MISO-APP-100259 | 508 MW | Solar+Battery | LA | NextEra Energy Capital Holdings Inc | https://www.infrasure.ai/project/miso-app-100259 - MISO-J2590 | 500 MW | Battery | MI | — | https://www.infrasure.ai/project/miso-j2590 - MISO-J2690 | 500 MW | Wind+Battery | IL | — | https://www.infrasure.ai/project/miso-j2690 - MISO-J2694 | 500 MW | Solar+Battery | IL | — | https://www.infrasure.ai/project/miso-j2694 - MISO-J2696 | 500 MW | Solar | AR | — | https://www.infrasure.ai/project/miso-j2696 - MISO-J2704 | 500 MW | Solar | LA | — | https://www.infrasure.ai/project/miso-j2704 - MISO-J2708 | 500 MW | Solar | LA | — | https://www.infrasure.ai/project/miso-j2708 - MISO-J3232 | 500 MW | Gas | IN | — | https://www.infrasure.ai/project/miso-j3232 - MISO-J2841 | 500 MW | Wind | AR | — | https://www.infrasure.ai/project/miso-j2841 - MISO-J3076 | 500 MW | Solar+Battery | IL | — | https://www.infrasure.ai/project/miso-j3076 - MISO-J4082 | 500 MW | Battery | AR | — | https://www.infrasure.ai/project/miso-j4082 - MISO-J4078 | 500 MW | Battery | MN | — | https://www.infrasure.ai/project/miso-j4078 - MISO-J4072 | 500 MW | Battery | MN | — | https://www.infrasure.ai/project/miso-j4072 - MISO-J3192 | 500 MW | Solar | AR | — | https://www.infrasure.ai/project/miso-j3192 - MISO-J4005 | 500 MW | Gas | IN | — | https://www.infrasure.ai/project/miso-j4005 - MISO-J3931 | 500 MW | Solar | IN | — | https://www.infrasure.ai/project/miso-j3931 - MISO-J1060 | 500 MW | Solar | AR | — | https://www.infrasure.ai/project/miso-j1060 - MISO-J4408 | 500 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4408 - MISO-J4381 | 500 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4381 - MISO-J1488 | 500 MW | Other | MO | — | https://www.infrasure.ai/project/miso-j1488 - MISO-J3860 | 500 MW | Wind | IL | — | https://www.infrasure.ai/project/miso-j3860 - MISO-J4355 | 500 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4355 - MISO-J4343 | 500 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4343 - MISO-J4322 | 500 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4322 - MISO-J1855 | 500 MW | Solar | AR | — | https://www.infrasure.ai/project/miso-j1855 - MISO-J1897 | 500 MW | Solar+Battery | AR | — | https://www.infrasure.ai/project/miso-j1897 - MISO-J1899 | 500 MW | Solar+Battery | AR | — | https://www.infrasure.ai/project/miso-j1899 - MISO-J4235 | 500 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4235 - MISO-J2190 | 500 MW | Solar+Battery | AR | — | https://www.infrasure.ai/project/miso-j2190 - MISO-J4215 | 500 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4215 - MISO-J4214 | 500 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4214 - MISO-J3532 | 500 MW | Solar | MN | — | https://www.infrasure.ai/project/miso-j3532 - MISO-J4194 | 500 MW | Battery | MN | — | https://www.infrasure.ai/project/miso-j4194 - MISO-J2171 | 500 MW | Solar | IL | — | https://www.infrasure.ai/project/miso-j2171 - MISO-J2395 | 500 MW | Solar | AR | — | https://www.infrasure.ai/project/miso-j2395 - MISO-J3401 | 500 MW | Solar | AR | — | https://www.infrasure.ai/project/miso-j3401 - MISO-J4388 | 499 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4388 - MISO-J1586 | 499 MW | Solar+Battery | MI | — | https://www.infrasure.ai/project/miso-j1586 - MISO-J4362 | 490 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4362 - MISO-J3964 | 490 MW | Solar | SD | — | https://www.infrasure.ai/project/miso-j3964 - MISO-J4333 | 490 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4333 - MISO-J3963 | 490 MW | Solar | SD | — | https://www.infrasure.ai/project/miso-j3963 - MISO-J4404 | 490 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4404 - MISO-J4281 | 481 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4281 - MISO-J3966 | 480 MW | Wind | MI | — | https://www.infrasure.ai/project/miso-j3966 - MISO-J3163 | 479 MW | Other | ND | — | https://www.infrasure.ai/project/miso-j3163 - Waterford 5 | 478 MW | Gas | LA | Entergy Louisiana, LLC | https://www.infrasure.ai/project/miso-e0029-waterford-5 - MISO-E0032 | 478 MW | Gas | TX | Entergy Texas, Inc. | https://www.infrasure.ai/project/miso-e0032 - MISO-J4372 | 470 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4372 - MISO-J4021 | 470 MW | Gas | IN | — | https://www.infrasure.ai/project/miso-j4021 - MISO-J3331 | 470 MW | Gas | IN | — | https://www.infrasure.ai/project/miso-j3331 - Red Butte Wind | 457 MW | Wind | ND | Red Butte Wind, LLC | https://www.infrasure.ai/project/miso-e0027-red-butte-wind - MISO-E0038 | 455 MW | Gas | WI | Wisconsin Power and Light Company (WPL) | https://www.infrasure.ai/project/miso-e0038 - MISO-E0037 | 455 MW | Gas | WI | Wisconsin Power and Light Company (WPL) | https://www.infrasure.ai/project/miso-e0037 - MISO-J2966 | 450 MW | Solar | MS | — | https://www.infrasure.ai/project/miso-j2966 - MISO-J2914 | 450 MW | Solar+Battery | LA | — | https://www.infrasure.ai/project/miso-j2914 - MISO-J3030 | 450 MW | Solar+Battery | AR | — | https://www.infrasure.ai/project/miso-j3030 - MISO-J3730 | 444 MW | Wind | IL | — | https://www.infrasure.ai/project/miso-j3730 - MISO-J1858 | 440 MW | Solar | AR | — | https://www.infrasure.ai/project/miso-j1858 - Monroe ERAS | 432 MW | Battery | MI | DTE Energy | https://www.infrasure.ai/project/miso-e0018-monroe-eras - MISO-J3762 | 430 MW | Solar | MN | — | https://www.infrasure.ai/project/miso-j3762 - MISO-J4389 | 430 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4389 - Cannon Falls Uprate | 428 MW | Gas | MN | Invenergy Cannon Falls, LLC | https://www.infrasure.ai/project/miso-e0026-cannon-falls-uprate - MISO-J4160 | 425 MW | Gas | MI | — | https://www.infrasure.ai/project/miso-j4160 - Replacing 300 MW of existing coal generation with BESS; Edgewater 5 | 423 MW | Battery | — | — | https://www.infrasure.ai/project/miso-r1015-replacing-300-mw-of-existing-coal-generation-with-bess-edgewater-5 - MISO-J3975 | 417 MW | Solar | WI | — | https://www.infrasure.ai/project/miso-j3975 - MISO-J4340 | 415 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4340 - MISO-J1263 | 409 MW | Solar+Battery | IL | — | https://www.infrasure.ai/project/miso-j1263 - Merom Storage | 405 MW | Solar+Battery | IN | Hoosier Energy / Solvenz | https://www.infrasure.ai/project/miso-app-100245-merom-storage - MISO-J1026 | 400 MW | Wind | MO | — | https://www.infrasure.ai/project/miso-j1026 - MISO-J4394 | 400 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4394 - MISO-J2268 | 400 MW | Solar | IA | — | https://www.infrasure.ai/project/miso-j2268 - MISO-J2302 | 400 MW | Solar+Battery | LA | — | https://www.infrasure.ai/project/miso-j2302 - MISO-J2304 | 400 MW | Battery | WI | — | https://www.infrasure.ai/project/miso-j2304 - MISO-J2088 | 400 MW | Solar | AR | — | https://www.infrasure.ai/project/miso-j2088 - MISO-J2396 | 400 MW | Solar | AR | — | https://www.infrasure.ai/project/miso-j2396 - MISO-J2496 | 400 MW | Battery | IN | — | https://www.infrasure.ai/project/miso-j2496 - MISO-J2907 | 400 MW | Solar+Battery | AR | — | https://www.infrasure.ai/project/miso-j2907 - MISO-J2931 | 400 MW | Solar | KY | — | https://www.infrasure.ai/project/miso-j2931 - MISO-J3015 | 400 MW | Wind+Battery | IL | — | https://www.infrasure.ai/project/miso-j3015 - Surplus; G876/G877 | 400 MW | Wind | IL | — | https://www.infrasure.ai/project/miso-s1036-surplus-g876-g877 - MISO-J3701 | 400 MW | Wind | IA | — | https://www.infrasure.ai/project/miso-j3701 - MISO-J3712 | 400 MW | Wind | IL | — | https://www.infrasure.ai/project/miso-j3712 - MISO-J3992 | 400 MW | Battery | MI | — | https://www.infrasure.ai/project/miso-j3992 - MISO-J4093 | 400 MW | Battery | MI | — | https://www.infrasure.ai/project/miso-j4093 - MISO-J4110 | 400 MW | Gas | LA | — | https://www.infrasure.ai/project/miso-j4110 - MISO-S1125 | 400 MW | Solar+Battery | AR | — | https://www.infrasure.ai/project/miso-s1125 - MISO-J4231 | 400 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4231 - MISO-J4236 | 400 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4236 - MISO-J4347 | 400 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4347 - MISO-J4370 | 400 MW | Other | — | — | https://www.infrasure.ai/project/miso-j4370 - MISO-J2099 | 399 MW | Solar | WI | — | https://www.infrasure.ai/project/miso-j2099 - MISO-J2107 | 399 MW | Solar | WI | — | https://www.infrasure.ai/project/miso-j2107 - MISO-J2185 | 399 MW | Solar | WI | — | https://www.infrasure.ai/project/miso-j2185 - MISO-J2173 | 396 MW | Solar+Battery | MS | — | https://www.infrasure.ai/project/miso-j2173 (Showing top 200 by capacity. Full list crawlable from the human page.) ## See also - Operating fleet in MISO (Midcontinent): https://www.infrasure.ai/llms-data/grid/miso.txt - Per-project detail: https://www.infrasure.ai/api/project/{slug}/text ## Citation Source: https://www.infrasure.ai