11 plants · 4.8 GW total capacity
Battery Storage generation in Nevada includes 11 plants with 4.8 GW total capacity.
Largest is Purple Sage Energy Center (800 MW BESS); oldest active is Chukar Battery Energy Storage System (2021); newest is Silver State South Storage (2025); top owner is Berkshire Hathaway (3 plants).
Search plants, projects, owners, and states