Query
Zunkerville Solar
Type
Entity Briefing
Entity
Zunkerville Solar
Generated
2026-10-20T02:07:51.534Z

Briefing on Zunkerville Solar

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
201 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2029-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Zunkerville Solar is a 201 MW Solar+Battery project in Texas, currently active.

Zunkerville Energy, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-12-01.

Queue ID
ERCOT-28INR0443
Location
Karnes, Texas
Technology
Solar+Battery
Developer
Zunkerville Energy, LLC
Market / region
ERCOT
Point of interconnection
#5725 PAWNEE SWITCHING STATION 345kV

What stands out

1

Zunkerville Solar is a 201 MW Solar+Battery project in Texas with status active.

2

Zunkerville Energy, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-12-01.

Market and operating context

Queue date
2025-12-02
Proposed COD
2029-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Zunkerville Solar — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0443
LocationKarnes, Texas
TechnologySolar+Battery
DeveloperZunkerville Energy, LLC
Market / regionERCOT
Point of interconnection#5725 PAWNEE SWITCHING STATION 345kV
Queue date2025-12-02
Proposed COD2029-12-01