ZPD-PT Solar Project 2017-038 Hybrid LLC is a 9 MW Batteries asset in ISO New England, currently Operating.
ZPD-PT Solar Project 2017-038 Hybrid LLC is reported in Massachusetts since 2021 under AES Distributed Energy. Available operating and financial measures include 9.1% capacity factor and 7 GWh annual generation; $31.6/MWh reported energy value.
- Location
- Worcester, Massachusetts
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- AES Distributed Energy
- Operator
- AES Distributed Energy
- Grid
- ISO New England
- Plant ID
- 64147
What stands out
ZPD-PT Solar Project 2017-038 Hybrid LLC is a 9 MW Batteries asset in Massachusetts with status Operating.
Latest annual operating measures report 9.1% capacity factor and 7 GWh annual generation.
Available financial measures include $31.6/MWh energy value.
Market and operating context
- ISO / market
- ISO New England
- Balancing authority
- ISO New England Inc.
- NERC region
- NPCC
- State rank
- #12 of 525
- National rank
- #2309 of 7,971
Why it matters
For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.