Query
ZPD-PT Solar Project 2017-038 Hybrid LLC
Type
Entity Briefing
Entity
ZPD-PT Solar Project 2017-038 Hybrid LLC
Generated
2026-10-10T13:58:33.415Z

Briefing on ZPD-PT Solar Project 2017-038 Hybrid LLC

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
9 MW
Capacity
Operating
Current status
2021
Operating since
2
Generators
9.1%
Capacity factor
7 GWh
Annual generation
Briefing/plantOperating

ZPD-PT Solar Project 2017-038 Hybrid LLC is a 9 MW Batteries asset in ISO New England, currently Operating.

ZPD-PT Solar Project 2017-038 Hybrid LLC is reported in Massachusetts since 2021 under AES Distributed Energy. Available operating and financial measures include 9.1% capacity factor and 7 GWh annual generation; $31.6/MWh reported energy value.

Location
Worcester, Massachusetts
Technology
Batteries, Solar Photovoltaic
Owner / parent
AES Distributed Energy
Operator
AES Distributed Energy
Grid
ISO New England
Plant ID
64147

What stands out

1

ZPD-PT Solar Project 2017-038 Hybrid LLC is a 9 MW Batteries asset in Massachusetts with status Operating.

2

Latest annual operating measures report 9.1% capacity factor and 7 GWh annual generation.

3

Available financial measures include $31.6/MWh energy value.

Market and operating context

ISO / market
ISO New England
Balancing authority
ISO New England Inc.
NERC region
NPCC
State rank
#12 of 525
National rank
#2309 of 7,971

Why it matters

For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.