Query
Zeus Scurry BESS
Type
Entity Briefing
Entity
Zeus Scurry BESS
State
TN
Technology
battery
Generated
2026-10-19T11:45:28.349Z

Briefing on Zeus Scurry BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
1 GW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-10-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Zeus Scurry BESS is a 1 GW Solar+Battery project in Texas, currently active.

Zeus Scurry BESS is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-10-01.

Queue ID
ERCOT-27INR0535
Location
Scurry, Texas
Technology
Solar+Battery
Developer
Zeus Scurry BESS
Market / region
ERCOT
Point of interconnection
MHOS 345 kV Substation (#59911)

What stands out

1

Zeus Scurry BESS is a 1 GW Solar+Battery project in Texas with status active.

2

Zeus Scurry BESS is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-10-01.

Market and operating context

Queue date
2025-06-05
Proposed COD
2028-10-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Zeus Scurry BESS — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0535
LocationScurry, Texas
TechnologySolar+Battery
DeveloperZeus Scurry BESS
Market / regionERCOT
Point of interconnectionMHOS 345 kV Substation (#59911)
Queue date2025-06-05
Proposed COD2028-10-01