Zeus Armstrong BESS is a 1 GW Solar+Battery project in Texas, currently active.
Armstrong BESS, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-04-17.
- Queue ID
- ERCOT-25INR0587
- Location
- Armstrong, Texas
- Technology
- Solar+Battery
- Developer
- Armstrong BESS, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345KV 23900 ALIBATES - 23914 TULECNYN
What stands out
1
Zeus Armstrong BESS is a 1 GW Solar+Battery project in Texas with status active.
2
Armstrong BESS, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-04-17.
Market and operating context
- Queue date
- 2024-03-22
- Proposed COD
- 2028-04-17
- IA status
- Facility Study
- Study phase
- Facility Study