Query
Youngs Creek Hydroelectric Project
Type
Entity Briefing
Entity
Youngs Creek Hydroelectric Project
Technology
hydro
Generated
2026-10-17T20:39:48.609Z

Briefing on Youngs Creek Hydroelectric Project

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
8 MW
Capacity
Operating
Current status
2011
Operating since
1
Generators
28.3%
Capacity factor
19 GWh
Annual generation
Briefing/plantOperating

Youngs Creek Hydroelectric Project is a 8 MW Conventional Hydroelectric asset in Washington, currently Operating.

Youngs Creek Hydroelectric Project is reported in Washington since 2011 under PUD No 1 of Snohomish County - (WA). Available operating and financial measures include 28.3% capacity factor and 19 GWh annual generation; $2294/kW reported CapEx.

Location
Snohomish, Washington
Technology
Conventional Hydroelectric
Owner / parent
PUD No 1 of Snohomish County - (WA)
Operator
PUD No 1 of Snohomish County - (WA)
Grid
Bonneville Power Administration
Plant ID
57763

What stands out

1

Youngs Creek Hydroelectric Project is a 8 MW Conventional Hydroelectric asset in Washington with status Operating.

2

Latest annual operating measures report 28.3% capacity factor and 19 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

Market and operating context

Balancing authority
Bonneville Power Administration
NERC region
WECC
State rank
#54 of 73
National rank
#756 of 1,462

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.