Query
Yellow Pine II
Type
Entity Briefing
Entity
Yellow Pine II
State
ME
Summary generated
Oct 18, 2026
First saved
Date not recorded

Briefing on Yellow Pine II

Entity Briefing

Summary generated Oct 18, 2026 (UTC).

Source dates used by this summary were not recorded.

210 MW
Capacity
Operating
Current status
2024
Operating since
4
Generators
20.3%
Capacity factor
374 GWh
Annual generation
Briefing/plantOperating

Yellow Pine II is a 210 MW Batteries asset in Nevada, currently Operating.

Yellow Pine II is reported in Nevada since 2024 under NextEra Energy. Available operating and financial measures include 20.3% capacity factor and 374 GWh annual generation.

Location
Clark, Nevada
Technology
Batteries, Solar Photovoltaic
Owner / parent
NextEra Energy
Operator
Yellow Pine Solar II, LLC
Grid
Nevada Power Company
Plant ID
67091

What stands out

1

Yellow Pine II is a 210 MW Batteries asset in Nevada with status Operating.

2

Latest annual operating measures report 20.3% capacity factor and 374 GWh annual generation.

3

Latest linked story: “NextEra Energy ranked No. 1 in its industry on Fortune's list of 'World's Most Admired Companies'” (NextEra Energy Newsroom, 2025-01-30).

Market and operating context

Balancing authority
Nevada Power Company
NERC region
WECC
State rank
#14 of 62
National rank
#332 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.