Yellow Pine II is a 210 MW Batteries asset in Nevada, currently Operating.
Yellow Pine II is reported in Nevada since 2024 under NextEra Energy. Available operating and financial measures include 20.3% capacity factor and 374 GWh annual generation.
- Location
- Clark, Nevada
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- NextEra Energy
- Operator
- Yellow Pine Solar II, LLC
- Grid
- Nevada Power Company
- Plant ID
- 67091
What stands out
Yellow Pine II is a 210 MW Batteries asset in Nevada with status Operating.
Latest annual operating measures report 20.3% capacity factor and 374 GWh annual generation.
Latest linked story: “NextEra Energy ranked No. 1 in its industry on Fortune's list of 'World's Most Admired Companies'” (NextEra Energy Newsroom, 2025-01-30).
Market and operating context
- Balancing authority
- Nevada Power Company
- NERC region
- WECC
- State rank
- #14 of 62
- National rank
- #332 of 7,971
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.