Briefing/projectactive
YELLOW PINE 3 is a 517 MW Solar+Battery project in Nevada, currently active.
The reported queue phase is C12. Proposed COD is 2026-12-01.
- Queue ID
- CAISO-1654
- Location
- Clark, Nevada
- Technology
- Solar+Battery
- Market / region
- CAISO
- Point of interconnection
- Trout Canyon Substation 230 kV
What stands out
1
YELLOW PINE 3 is a 517 MW Solar+Battery project in Nevada with status active.
2
The reported queue phase is C12; proposed COD is 2026-12-01.
3
Latest linked story: “NextEra and SJCE renegotiate offtake agreement for CAISO-related BESS after interconnection delays” (Energy-Storage.News, 2025-03-17).
Market and operating context
- Queue date
- 2019-04-15
- Proposed COD
- 2026-12-01
- IA status
- IA Executed
- Study phase
- C12
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.