Yellow Leaf Solar is a 105 MW Solar+Battery project in Texas, currently active.
Lightsource Renewable Energy Development LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-25.
- Queue ID
- ERCOT-27INR0455
- Location
- Kaufman, Texas
- Technology
- Solar+Battery
- Developer
- Lightsource Renewable Energy Development LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV #2727 Crandall - #12715 Forney S
What stands out
1
Yellow Leaf Solar is a 105 MW Solar+Battery project in Texas with status active.
2
Lightsource Renewable Energy Development LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-09-25.
Market and operating context
- Queue date
- 2025-04-25
- Proposed COD
- 2028-09-25
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.