Briefing/plantOperating
Wynoochee is a 13 MW Conventional Hydroelectric asset in Washington, currently Operating.
Wynoochee is reported in Washington since 1994 under City of Tacoma - (WA). Available operating and financial measures include 27.4% capacity factor and 31 GWh annual generation; $2294/kW reported CapEx.
- Location
- Grays Harbor, Washington
- Technology
- Conventional Hydroelectric
- Owner / parent
- City of Tacoma - (WA)
- Operator
- City of Tacoma - (WA)
- Grid
- City of Tacoma, Department of Public Utilities, Light Division
- Plant ID
- 7127
What stands out
1
Wynoochee is a 13 MW Conventional Hydroelectric asset in Washington with status Operating.
2
Latest annual operating measures report 27.4% capacity factor and 31 GWh annual generation.
3
Available financial measures include $2294/kW CapEx.
Market and operating context
- Balancing authority
- City of Tacoma, Department of Public Utilities, Light Division
- NERC region
- WECC
- State rank
- #47 of 73
- National rank
- #588 of 1,462
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.