Query
WRIGHT SOLAR
Type
Entity Briefing
Entity
WRIGHT SOLAR
Generated
2026-10-13T22:32:53.120Z

Briefing on WRIGHT SOLAR

Entity Briefing
Generated Oct 13, 2026·Dataset freshness not reported
280 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2026-10-21
Proposed COD
C04
Queue phase
Briefing/projectactive

WRIGHT SOLAR is a 280 MW Solar+Battery project in California, currently active.

The reported queue phase is C04. Proposed COD is 2026-10-21.

Queue ID
CAISO-779
Location
Merced, California
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Los Banos-Panoche #1 230kV Line

What stands out

1

WRIGHT SOLAR is a 280 MW Solar+Battery project in California with status active.

2

The reported queue phase is C04; proposed COD is 2026-10-21.

3

Latest linked story: “Peninsula Clean Energy goes big time with 200 MW-AC solar project” (pv magazine USA, 2018-10-11).

Market and operating context

Queue date
2011-03-31
Proposed COD
2026-10-21
IA status
IA Executed
Study phase
C04
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

WRIGHT SOLAR — verified asset snapshot

FieldValue
Queue IDCAISO-779
LocationMerced, California
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionLos Banos-Panoche #1 230kV Line
Queue date2011-03-31
Proposed COD2026-10-21
IA statusIA Executed