Woodward Mountain II is a 78 MW Onshore Wind Turbine asset in ERCOT (Texas), currently Operating.
Woodward Mountain II is reported in Texas since 2001 under NextEra Energy. Available operating and financial measures include 24.5% capacity factor and 168 GWh annual generation; $1895/kW reported CapEx.
- Location
- Pecos, Texas
- Technology
- Onshore Wind Turbine
- Owner / parent
- NextEra Energy
- Operator
- Pecos Wind II LP
- Grid
- ERCOT (Texas)
- Plant ID
- 55795
What stands out
Woodward Mountain II is a 78 MW Onshore Wind Turbine asset in Texas with status Operating.
Latest annual operating measures report 24.5% capacity factor and 168 GWh annual generation.
Available financial measures include $1895/kW CapEx.
Latest linked story: “Earnings call transcript: NextEra Energy Q1 2026 results beat EPS forecast” (Investing.com, 2026-04-28).
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #225 of 252
- National rank
- #847 of 1,442
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.