Query
Wood County
Type
Entity Briefing
Entity
Wood County
Generated
2026-09-17T23:47:26.078Z

Briefing on Wood County

Entity Briefing
Generated Sep 17, 2026·Dataset freshness not reported
225 MW
Capacity
Operating
Current status
2022
Operating since
2
Generators
13.9%
Capacity factor
275 GWh
Annual generation
Briefing/plantOperating

Wood County is a 225 MW Batteries asset in MISO (Midcontinent), currently Operating.

Wood County is reported in Wisconsin since 2022 under Alliant Energy. Available operating and financial measures include 13.9% capacity factor and 275 GWh annual generation; $1739/kW reported CapEx.

Location
Wood, Wisconsin
Technology
Batteries, Solar Photovoltaic
Owner / parent
Alliant Energy
Operator
Wisconsin Power & Light Co
Grid
MISO (Midcontinent)
Plant ID
65011

What stands out

1

Wood County is a 225 MW Batteries asset in Wisconsin with status Operating.

2

Latest annual operating measures report 13.9% capacity factor and 275 GWh annual generation.

3

Available financial measures include $4.0/MWh OpEx, $1739/kW CapEx.

4

Latest linked story: “Alliant Energy utility wants to demonstrate nation’s first CO2-based long-duration ‘energy dome’” (Utility Dive, 2024-08-20).

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
State rank
#8 of 132
National rank
#311 of 7,971

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.