Wolf Summit Energy is a 579 MW Natural Gas Fired Combined Cycle asset in PJM Interconnection, currently Planned.
Wolf Summit Energy is reported in West Virginia under General Electric. Available operating and financial measures include $782/kW reported CapEx.
- Location
- Harrison, West Virginia
- Technology
- Natural Gas Fired Combined Cycle
- Owner / parent
- General Electric
- Operator
- Wolf Summit Energy LLC
- Grid
- PJM Interconnection
- Plant ID
- 60206
What stands out
Wolf Summit Energy is a 579 MW Natural Gas Fired Combined Cycle asset in West Virginia with status Planned.
Available financial measures include $782/kW CapEx.
Latest linked story: “Kindle Energy and Blackstone Start Construction on 600MW CCGT Plant in Harrison County - News and Statistics” (IndexBox, 2026-04-28).
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
- State rank
- #1 of 5
- National rank
- #432 of 2,025
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.