Briefing on Wolf Hollow III

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
306 MW
Proposed capacity
active
Current status
Gas
Technology
ERCOT
Market / region
2027-05-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Wolf Hollow III is a 306 MW Gas project in Texas, currently active.

Wolf Hollow II Power LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-05-31.

Queue ID
ERCOT-24INR0567
Location
Hood, Texas
Technology
Gas
Developer
Wolf Hollow II Power LLC
Market / region
ERCOT
Point of interconnection
1877 Mitchell Bend 345KV

What stands out

1

Wolf Hollow III is a 306 MW Gas project in Texas with status active.

2

Wolf Hollow II Power LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-05-31.

Market and operating context

Queue date
2023-06-07
Proposed COD
2027-05-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Wolf Hollow III — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0567
LocationHood, Texas
TechnologyGas
DeveloperWolf Hollow II Power LLC
Market / regionERCOT
Point of interconnection1877 Mitchell Bend 345KV
Queue date2023-06-07
Proposed COD2027-05-31