Wolf Hollow III is a 306 MW Gas project in Texas, currently active.
Wolf Hollow II Power LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-05-31.
- Queue ID
- ERCOT-24INR0567
- Location
- Hood, Texas
- Technology
- Gas
- Developer
- Wolf Hollow II Power LLC
- Market / region
- ERCOT
- Point of interconnection
- 1877 Mitchell Bend 345KV
What stands out
1
Wolf Hollow III is a 306 MW Gas project in Texas with status active.
2
Wolf Hollow II Power LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-05-31.
Market and operating context
- Queue date
- 2023-06-07
- Proposed COD
- 2027-05-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.