Query
WOE Gyp King Wind
Type
Entity Briefing
Entity
WOE Gyp King Wind
State
WA
Technology
wind
Generated
2026-10-19T05:49:00.745Z

Briefing on WOE Gyp King Wind

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
304 MW
Proposed capacity
active
Current status
Wind
Technology
ERCOT
Market / region
2030-08-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

WOE Gyp King Wind is a 304 MW Wind project in Texas, currently active.

KSK Wind Farm 1, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-08-31.

Queue ID
ERCOT-25INR0401
Location
King, Texas
Technology
Wind
Developer
KSK Wind Farm 1, LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV 33798 GYP_18 – 6088 BENJ4A

What stands out

1

WOE Gyp King Wind is a 304 MW Wind project in Texas with status active.

2

KSK Wind Farm 1, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2030-08-31.

Market and operating context

Queue date
2023-04-18
Proposed COD
2030-08-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

WOE Gyp King Wind — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0401
LocationKing, Texas
TechnologyWind
DeveloperKSK Wind Farm 1, LLC
Market / regionERCOT
Point of interconnectionTap 138kV 33798 GYP_18 – 6088 BENJ4A
Queue date2023-04-18
Proposed COD2030-08-31