Briefing/projectactive
WOE Gyp King Wind is a 304 MW Wind project in Texas, currently active.
KSK Wind Farm 1, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-08-31.
- Queue ID
- ERCOT-25INR0401
- Location
- King, Texas
- Technology
- Wind
- Developer
- KSK Wind Farm 1, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV 33798 GYP_18 – 6088 BENJ4A
What stands out
1
WOE Gyp King Wind is a 304 MW Wind project in Texas with status active.
2
KSK Wind Farm 1, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2030-08-31.
Market and operating context
- Queue date
- 2023-04-18
- Proposed COD
- 2030-08-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.