Briefing on Wizard BESS

Entity Briefing

Summary generated Oct 18, 2026 (UTC).

Source dates used by this summary were not recorded.

151 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2026-02-14
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Wizard BESS is a 151 MW Battery project in Texas, currently active.

Wizard Energy Storage, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-02-14.

Queue ID
ERCOT-25INR0300
Location
Galveston, Texas
Technology
Battery
Developer
Wizard Energy Storage, LLC
Market / region
ERCOT
Point of interconnection
To the 138 kV League City Substation (#38920)

What stands out

1

Wizard BESS is a 151 MW Battery project in Texas with status active.

2

Wizard Energy Storage, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-02-14.

Market and operating context

Queue date
2023-03-27
Proposed COD
2026-02-14
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Wizard BESS — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0300
LocationGalveston, Texas
TechnologyBattery
DeveloperWizard Energy Storage, LLC
Market / regionERCOT
Point of interconnectionTo the 138 kV League City Substation (#38920)
Queue date2023-03-27
Proposed COD2026-02-14