Query
Winona County Wind LLC
Type
Entity Briefing
Entity
Winona County Wind LLC
Generated
2026-10-17T09:19:19.508Z

Briefing on Winona County Wind LLC

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
2 MW
Capacity
Out of service
Current status
2011
Operating since
1
Generators
0.0%
Capacity factor
0 GWh
Annual generation
Briefing/plantOut of service

Winona County Wind LLC is a 2 MW Onshore Wind Turbine asset in MISO (Midcontinent), currently Out of service.

Winona County Wind LLC is reported in Minnesota since 2011 under Winona County Wind LLC. Available operating and financial measures include 0.0% capacity factor and 0 GWh annual generation; $1895/kW reported CapEx.

Location
Winona, Minnesota
Technology
Onshore Wind Turbine
Owner / parent
Winona County Wind LLC
Operator
Winona County Wind LLC
Grid
MISO (Midcontinent)
Plant ID
57547

What stands out

1

Winona County Wind LLC is a 2 MW Onshore Wind Turbine asset in Minnesota with status Out of service.

2

Latest annual operating measures report 0.0% capacity factor and 0 GWh annual generation.

3

Available financial measures include $1895/kW CapEx.

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
State rank
#113 of 123
National rank
#1415 of 1,442

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.