Windsor Cooper HIill Solar, LLC is a 5 MW Solar Photovoltaic asset in PJM Interconnection, currently Operating.
Windsor Cooper HIill Solar, LLC is reported in North Carolina since 2015 under Duke Energy Renewables Services. Available operating and financial measures include 20.5% capacity factor and 9 GWh annual generation; $28.5/MWh reported energy value.
- Location
- Bertie, North Carolina
- Technology
- Solar Photovoltaic
- Owner / parent
- Duke Energy Renewables Services
- Operator
- Duke Energy Renewables Services
- Grid
- PJM Interconnection
- Plant ID
- 58847
What stands out
Windsor Cooper HIill Solar, LLC is a 5 MW Solar Photovoltaic asset in North Carolina with status Operating.
Latest annual operating measures report 20.5% capacity factor and 9 GWh annual generation.
Available financial measures include $28.5/MWh energy value.
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- SERC
- State rank
- #314 of 782
- National rank
- #3382 of 7,971
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.